Dimplex Optimyst CAS500R-RGB-EU Operating Instructions Manual page 6

Hide thumbs Also See for Optimyst CAS500R-RGB-EU:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
to the surround using the four fixing holes shown in Fig 8.
COMMISSIONING/INITIAL PRODUCT START-UP
CONNECTING THE RECEIVER/TETHERED REMOTE
With the fuel bed removed, Connect the Bluetooth receiver connector into the receiver cable socket at the back of the
appliance (Fig 9). It is important to ensure that the jack is pushed fully into the socket. Failure to fully insert the connector
will prevent the product from functioning correctly. The receiver has a cable length of 1.4m which will allow you position it
anywhere around the product. If you prefer to hide it, the receiver can be placed inside the surround/wall. Please ensure
that the receiver is not enclosed in metal, concrete or any other dense material, this will affect the signal from the remote
control.
FILLING THE WATER TANK
Before powering on the product for the first time, ensure that a full water tank has been placed on the product. Remove
the water tank from its location on top of the sump (Fig 10) and open it by unscrewing the orange cap (Fig 11). The tank
should be filled with clean (decalcified) water only - Refer to WATER QUALITY & CLEANING for more details. When the
tank is replaced on top of the sump, it will take about one minute for the tank to empty into the sump. Allow the sump to
fill fully before switching on the product. Once filling is complete, the tank can be refilled and replaced on top of the sump.
This will allow for the maximum capacity of water to be stored in the product. Close the drawer when filled.
INSTALLING THE LOG FUEL BED (IF SUPPLIED)
The product is supplied with a 'metal fuel bed' fitted. If you have chosen to operate your product with a log fuel bed,
remove this metal fuel bed and retain it for future use (Fig. 12). Follow the steps below to install the log fuel bed.
1.
Gently lift the LED Log fuel bed out of its packaging. CAUTION: The fuel bed weighs 5kg. Be sure to only lift the fuel
bed by the two centre logs (Fig. 13).
2.
Place the fuel bed on top of the appliance, there are 4 plastic guides under the fuel bed to help locate it (Fig.7).
Please note the fuel bed can be placed front to back or back to front on the product.
3.
Once the fuel bed is in place, remove the small loose log (Fig 14). This small log is secured with magnets and should
easily lift off the fuel bed.
4.
Locate the DC jack under the small log and connect it to the corresponding DC jack located on the product through
the hole in the fuel bed (Fig.15).
5.
Each log fuel bed is supplied with a loose non LED log. For single CAS500R-RGB-EU installations, this can be
placed on top of the fuel bed or stored away with the packaging. For CAS1000R-RGB-EU or multiple product
installations, the loose log can be placed on the join in the centre between two fuel beds (Fig 16).
MULTIPLE PRODUCT INSTALLATION (DAISY CHAINING)
POWER CONNECTIONS
Both the CAS500R-RGB-EU and CAS1000R-RGB-EU products can be installed side by side to elongate the flame
effect. When supplying power to multiple products, ensure the maximum wattage of the combined products does not
exceed the rated capacity of the MCB (Minature Circuit Breaker) in the circuit.
MULTIPLE PRODUCT INSTALLATION
Follow steps 1-4 in "Installing the Product into Surround/Enclosure" to fit the first product. It is important that the first
product is orientated so that the side of the product with the slots is left free and not connected to first end of the
installation (Fig 17).
1.
When the first product is installed and securely fixed, prepare the second product by unscrewing the joining screws
and screwing them into the opposite side of the metalwork (Fig 18). Please note, these screws should not be fully
tightened and 5-10mm of thread should be left protruding from the edge of the product.
2.
Fit the second product beside the first product, ensuring the protruding screws of the second product engage with
slots of the first product. (Fig 19)
3.
Ensure the second product is at the correct height to match the first product and ensure it is adequately level. This
can be done by adjusting the adjustable feet with a flat head screwdriver. (Fig 5) The levelness of the product can
be verified by checking the on-board level (Fig 6)
4.
Tighten the screws of the second product so that it joins tightly with the first product.
Additional products can be fitted to the second product by following steps 1-4 above.
MULTIPLE PRODUCT CONTROL
Each product has been supplied with its own link wire in order to form a hardwire link between multiple products.
Please follow the instructions below to link multiple products together.
1.
Identify the 'master' product in the installation. It should the product on the left hand side of the installation.
2.
Connect the Bluetooth receiver to this product (Fig 20A, 21A). This will be the only Bluetooth receiver in the
installation and will control the rest of the products in the installation. In an installation of both CAS500R-RGB-EU &
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optimyst cas1000r-rgb-eu

Table of Contents