4.3 Connection WTR 120 with M12 plug

4.4 Mechanical assembly

 For adaptation in your process, only use the weld-in sockets and process
connections from promesstec. This is the only way we can promise you an op-
timal measuring point.
 After installing the sensor, check the tightness of the measuring point

4.5 Electrical assembly

The electrical installation must be carried out in a de-energized state.
Connection with cable gland:
 Insert the connection cable into the cable entry (screw connection). Be careful
not to damage the seal on the cable gland.
 Connect the connecting cables according to your circuit task.
 You can parameterize the device via the interface (DMU 100, KMU 100 or
KMUS 100 measuring transducer option).
 Close the case and turn on the power.
Connection with M12 connector:
 Screw the M12 socket onto the plug on the promesstec by hand
 Sensor. Assembly is carried out without tools.
 When installing the connection cable, ensure that it is firm and form-fitting
 Connection of both components. The permissible tightening torque can be
found in the data sheet of the respective connection cable.
promesstec GmbH I Niedersachsenstraße 4 I D-48465 Schüttorf I Tel.:+49 (0)5923/ 90 229 0 I Fax:+49 (0)5923/ 90 229 29
E-Mail: office@promesstec.com I Internet: www.promesstec.com
Version 3.1.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wtr 120-5-b-1a3-kmuWtr 120-1-b-1a3-kmu

Table of Contents