Assembly Instructions
you will need the following:
• Phillips Head Screwdriver
• Bucket
• Scissors / Razor Blade
Secure each Pem Stud (D2) to the Lid Separator (A)
1
through the holes as shown in [FIG. 1].
8
Oneida Air Systems
• Wet/Dry Vacuum
• Vacuum hose and adapters
(2.5" recommended)
D2
FIG. 1