7. Install Hybrid Power Unit
2-Pin Power
Connector
to control box
DC-DC Booster Assembly
IMPORTANT! Verify that you are following the correct power system installation
based on your model number. For a DC power unit installation, refer to "Install DC
Power Unit."
IMPORTANT! In the event of leaking batteries, replace the battery box and batteries.
IMPORTANT! Use care not to pinch the tube or cables when installing the cover.
IMPORTANT! The area in front of the sensor must be free of objects during the 2
minute learning cycle or the faucet may not function properly.
Unthread the control box screws to remove the control box cover.
Connect the power cords.
Place the hybrid battery into the empty space within the control box.
Secure the control box cover to the control box.
Allow 2 minutes for the sensor to cycle through the automatic sensing distance.
Kohler Co.
2-Pin Power
Molex Connector
to Battery/AC/Hybrid
Battery
Hybrid Battery
Power Cord
13
LED
1561532-2-A