BWT AQA Smart Installation And Operating Manual page 29

Hide thumbs Also See for AQA Smart:
Table of Contents

Advertisement

Available languages

Available languages

Unit setup
Unit setup
Unit setup
Unit setup
Unit setup
Thread the brine hose and connection cable
through the drill hole in the black cover.
Place and align the softening column with control
valve behind the cabinet.
Insert the brine hose into the hose elbow to the
limit stop (approx. 15 mm deep).
Connect the connection cable with the plugs on
the control valve.
GB GB
GB GB
GB
29
29
29
29
29

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AQA Smart and is the answer not in the manual?

Table of Contents