Riello 3433723 Installation, Use And Maintenance Instructions page 21

Heavy oil burner
Table of Contents

Advertisement

Available languages

Available languages

3.
INSTALLATION
3.1
FUEL OIL GRAVITY FEED SYSTEMS
GRAVITY SYSTEM
For fuel oil with viscosity max. 7°E at 50°C.
SUCTION SYSTEM
For fuel oil with viscosity max. 7°E at 50°C.
RING SUPPLY
For heavy oil with viscosity up to 20°E / 50°C.
1 - Tank (properly heated for heavy oil)
2 - Filter (with resistance for oil > 7°E / 50°C)
3 - Burner (with kit for heavy oil)
4 - Couple of cocks (excluding the burner)
Notice: all the pipes have to be properly seized, sealed and heated (elec. resistance or hot steam or water) to let
the fuel flow.
Warning: before to put the burner in operation verify that no obstruction exists into the pipes, any obstruction
may damage the sealing of the pump.
5827
Priming pump:
loose the tap of the vacuometer plug (5,
fig. 1) and wait for the fuel flow.
H: Difference in the pipes height
L: Length of the suction pipe
D2629
Not advised, to be used only in
case of previously existing sys-
tem.
Never overcome the max. depres-
sion of 0.5 bar (38 cm Hg).
With higher values the fuel emanates
gas. The pipes shall be perfectly
D2630
sealead. When the tank is placed be-
low of the burner level, the return
pipe should reach the same level of
the suction pipe. In this case the foot
valve is not required.
5 - Forwarding pump
6 - Manometer
7 - Burner pump
8 - Pressure adjuster
3
GB
L meters
H
meters
ø 3/4"
ø 1"
0
5
10
0.5
8
15
1
11
20
1.5
14
25
2
17
30
L meters
H
meters
ø 1"
ø 1 1/4"
0
24
45
0.5
21
40
1
18
35
1.5
15
30
2
12
25
2.5
9
20
3
6
15
D2631

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Press 30 n3433724

Table of Contents