Server CP-3L Quick Start Manual page 7

Stainless steel pump
Table of Contents

Advertisement

INSTALL LARGE O-RING
5
into valve body. Apply food equipment
lubricant on o-ring.
INSTALL CYLINDER
6
onto valve body.
TILT wide edge of cylinder
under nub on rim of valve body.
FIT TABS on cylinder into
corresponding notches in
valve body.
PRESS DOWN firmly and
ROTATE cylinder clockwise
to secure into slots.
INSTALL MEDIUM O-RING
7
onto discharge tube.
Apply food equipment
lubricant on o-ring.
INSTALL DISCHARGE TUBE
8
onto valve body. Rotate discharge tube
clockwise and press down firmly to
secure into slots on valve body.
If your pump model includes a
Add suction tube to the bottom of the
valve body to increase length.
INSTALL LID
9
by sliding smaller lid hole
over discharge tube.
Align center hole with
threads on cylinder.
SECURE LID
10
Slide discharge tube nut
onto discharge tube.
Rotate nut clockwise to secure.
INSTALL PLUNGER ASSEMBLY
11
into cylinder.
Rotate locking collar clockwise
onto cylinder threads to secure.
SUCTION TUBE:
Page 7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CP-3L and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Cp-5lCp-5.5lCp-10lCp-ss

Table of Contents