Unit installation

6.1.1 Installation site requirements of the outdoor unit

Installer reference guide
26
WARNING
Make sure installation, servicing, maintenance and repair comply with instructions
from Daikin and with applicable legislation (for example national gas regulation) and
are executed ONLY by authorised persons.
INFORMATION
Also read the following requirements:
General installation site requirements. See the "General safety precautions"
chapter.
Refrigerant piping requirements (length, height difference). See further in this
"Preparation" chapter.
Mind the following spacing guidelines:
>150
>300
b
a
(mm)
a Air outlet
b Air inlet
NOTICE
Do NOT stack the units on each other.
Do NOT hang the unit on a ceiling.
Strong winds (≥18 km/h) blowing against the outdoor unit's air outlet causes short
circuit (suction of discharge air). This may result in:
deterioration of the operational capacity;
frequent frost acceleration in heating operation;
disruption of operation due to decrease of low pressure or increase of high
pressure;
a broken fan (if a strong wind blows continuously on the fan, it may start rotating
very fast, until it breaks).
It is recommended to install a baffle plate when the air outlet is exposed to wind.
It is recommended to install the outdoor unit with the air inlet facing the wall and
NOT directly exposed to the wind.
b
>150
a
>50
(mm)
R32 split series
4P751614-2 – 2023.09