To Check For Leaks; To Perform Vacuum Drying - Daikin RXP20N5V1B9 Installer's Reference Manual

Hide thumbs Also See for RXP20N5V1B9:
Table of Contents

Advertisement

7
|
Piping installation

7.3.3 To check for leaks

7.3.4 To perform vacuum drying

Installer reference guide
40
NOTICE
Use this vacuum pump for R32 exclusively. Using the same pump for other
refrigerants may damage the pump and the unit.
NOTICE
Connect the vacuum pump to the service port of the gas stop valve.
Make sure that the gas stop valve and liquid stop valve are firmly closed before
performing the leak test or vacuum drying.
NOTICE
Do NOT exceed the unit's maximum working pressure (see "PS High" on the unit
name plate).
1 Charge the system with nitrogen gas up to a gauge pressure of at least
200 kPa (2 bar). It is recommended to pressurize to 3000 kPa (30 bar) in order
to detect small leaks.
2 Check for leaks by applying the bubble test solution to all connections.
NOTICE
ALWAYS use a recommended bubble test solution from your wholesaler.
NEVER use soap water:
Soap water may cause cracking of components, such as flare nuts or stop valve
caps.
Soap water may contain salt, which absorbs moisture that will freeze when the
piping gets cold.
Soap water contains ammonia which may lead to corrosion of flared joints
(between the brass flare nut and the copper flare).
3 Discharge all nitrogen gas.
Connect the vacuum pump and manifold as follows:
a
c
b
d
e
f
f
g
a Low pressure gauge
b Gauge manifold
c High pressure gauge
d Low-pressure valve (Lo)
e High-pressure valve (Hi)
h
k
i
j
h
R32 split series
4P751614-2 – 2023.09