Performance Check Procedure
g,
CHECK—the signal amplitude is between 1.9 and 2.1 divisions.
h.
Repeat the procedure for CH 2.
9. CH 1 and CH 2 Vertical Deflection Accuracy
a.
Set CH 2 VOLTS/DIV to 2 mV.
b.
Set calibration generator to Std Ampl output, 10 mV.
c.
Position the trace two graticule lines below the center horizontal
graticule line.
d.
CHECK—ali positions of the VOLTS/DIV settings for correct signal to
graticule accuracy, using the settings in Table 7-2,
Signal-to-
Graticule Accuracy, for the checks.
e.
Set calibration generator to Std Ampl output, 10 mV.
f.
Move the test signal to the CH 1 input.
g.
Set:
VERTICAL MODE
CH 1 (CH 2 off)
CH 1 VOLTS/DiV
2 mV
h.
Same as c. above.
i.
Repeat CHECK procedure for CH 1.
2245A Operators
7~15