In-back/Out-back Cooling Kit for FK09c/FB09c and FK10c/FB10c
Installation Guide
3.
Fasten 9 M5x12 screws (T25), attaching the cable access plate to the opening in the base plate adapter.
Illustration 6: Installation of Cable Access Plate
2.7 Lifting the Frequency Converter
LIFTING PRECAUTIONS
The frequency converter is heavy. Failure to follow local safety regulations for lifting heavy weights can cause death, person-
al injury, or property damage.
-
Ensure that the lifting equipment is in proper working condition.
-
Check the weight of the frequency converter and verify that the lifting equipment can safely lift the weight.
-
Always lift the frequency converter using the eye bolts at the top of the frequency converter.
-
Ensure that the angle from the top of the frequency converter to the lifting cable is 65° or greater.
-
Test lift the frequency converter approximately 610 mm (24 in) to verify the proper center of gravity lift point. Reposition the
lifting point if the frequency converter is not level.
-
Never walk under suspended loads.
Always lift the frequency converter using the recommended lifting method and safety precautions.
8 | Danfoss A/S © 2023.09
W A R N I N G
Installation
AN371942578354en-000101 / 136R0290
Need help?
Do you have a question about the 176F4190 and is the answer not in the manual?
Questions and answers