Topmix2.Touch Assembly Procedures; Connecting The Cables To The Topmix2.Touch - Sartorius TopMix2.Touch User Manual

Hide thumbs Also See for TopMix2.Touch:
Table of Contents

Advertisement

TOPMIX2.TOUCH ASSEMBLY PROCEDURES

The TopMix2.Touch assembly procedures consist of connecting the cables to the
TopMix2.Touch, converter box and your computer. Many of the components have
been identified with labels to assist you with these procedures. Below is a
diagram of how the TopMix2.Touch, PMA.Evolution scale and its components are
connected. The following sections are step-by-step procedures on how to make
these connections.
Note: If you are not using a PMA.Evolution scale, your configuration will be
different. Please call ColorNet Support at 800-634-2614.

Connecting the Cables to the TopMix2.Touch

To help conserve space, you can mount your TopMix2.Touch on a wall or another
stable area.
1. Locate the TopMix2.Touch control unit, PMA.Evolution scale and the blue
20-meter cable.
2. Select a stable location inside your mixing area for the TopMix2.Touch and the
PMA.Evolution.
3. Place the control unit in the selected location in your mixing area. You will
need to turn the scale during the assembly so make sure that you have
enough room.
9

Advertisement

Table of Contents
loading

Table of Contents