Ecostrad ALLERTON Instruction Manual page 8

Electric towel rail
Hide thumbs Also See for ALLERTON:
Table of Contents

Advertisement

2. Insert the brackets
rail pipes temporarily.
4. Mark where the brackets sit on the
wall and where the base of the
towel rail meets the floor with a
pencil.
6. Drill the 16 required holes in the wall
using an 8mm drill bit.
Ecostrad_Allerton_TR_V1-03_02082023
(D)
into the towel
3. Position the towel rail against the
wall in your preferred mounting
location.
5. Remove the towel rail and place the
mounting plates
marked on the wall and floor. Mark
the drilling locations through the
holes of the mounting plates.
7. Push the wall plugs
pre-drilled holes.
(C)
on the positions
(B)
inside the 16
8

Advertisement

Table of Contents
loading

Table of Contents