Handling, transport and storage

Handling

All lifting and handling of the heat interface unit must be carried
out in an ergonomically responsible manner.

Transport and storage

The unit must be properly packed during both transit and storage.
Transport temperature:
Storage temperature:
When storing the unit prior to installation, it must be stored in a dry,
heated place.
If more units are supplied at the same time, they must never be stacked
higher than they were at the factory.

Assembly, installation and commissioning

Unpacking and preparation

Remove the packaging from the unit.
Cling film and cardboard must be disposed of in accordance with locally
applicable legislation.
8 | © Danfoss | 2021.06
-10 to +65°C
+10 to +65°C
Authorised personnel
Assembly, installation and commissioning must only be carried
out by an authorised HVAC technician.
Lifting the unit
When lifting the unit out of the cardboard box, only lift by the pipes
that are attached to the back plate.
Otherwise, to the extent possible, the heat interface unit must
be lifted by the back plate.
In connection with assembly, the unit must be lifted according
to the section "lifting instructions".
Warning of transport damage
Before installing the unit, check to ensure the product has not been
damaged during transit.