Termix VVX-I-R FI - 7 Series DS fully insulated
Pre hand over check list
Date:
Description:
Connection conneted correctly
All connections tightened
Primary system fl ushed, through fl ushing bypass
2 Strainers checked
Diff erential pressure controller adjusted
Clip on actuator removed
Wiring completed
Mains connected
Room controller connected and working
Pre payment unit connected and working
Pump setting completed
Correct pressure on secondary system
System properly vented
Underfl oor heating stat mounted correctly on heating
supply line
Safety valve checked and piped to drain
DHW Temperature setting
Heating temperature setting
Flushing bypass closed
Insulation has been remounted
32 | © Danfoss | DHS-SRMT/SI | 2021.06
Unit No.:
Pos.
Page
OK
11
9
20
31
21
69
21
15-16
10
23
26
18
20
60
24
4
24
74
25
7
21
Carried out by:
Remark:
LGB40450
Need help?
Do you have a question about the Termix VVX-I-R FI - 7 Series and is the answer not in the manual?
Questions and answers