Seismic attachment hardware shown on seismic calculations may differ from hardware supplied
with system. Any additional hardware that is required will be the responsibility of the institution
and/or their contractor. Contact your local GE Installation Program Manager to obtain seismic
calculations.
Seismic calculations are per California Building Code (CBC) and International Building Code
(IBC).
The following shows center-of-gravity information for system components:
•
System Control Cabinet,
•
Fluoro UPS UL,
•
Fluoro UPS CE,
•
PDB UL,
•
PDB CE,
•
Tube Chiller Coolix 4100,
•
Detector Conditioner,
•
Omega IV Table,
•
Omega V Long Table,
•
Gantry,
Illustration 2-78
•
19" Desk Mounted Monitor,
•
Mavig Overhead Flat Panel Suspension,
•
Ergo Overhead Flat Panel Suspension,
Chapter 2 Equipment Requirements
Illustration 2-69
Illustration 2-70
Illustration 2-71
Illustration 2-72
Illustration 2-73
Illustration 2-74
Illustration 2-75
Illustration 2-76
Illustration 2-77
Illustration 2-79
Optima IGS 320, Optima IGS 330 Pre-Installation Manual
Direction 5537562-1-1EN, Revision 3
Illustration 2-80
Illustration 2-81
137