GE Optima IGS 320 Preinstallation Manual page 137

Table of Contents

Advertisement

Seismic attachment hardware shown on seismic calculations may differ from hardware supplied
with system. Any additional hardware that is required will be the responsibility of the institution
and/or their contractor. Contact your local GE Installation Program Manager to obtain seismic
calculations.
Seismic calculations are per California Building Code (CBC) and International Building Code
(IBC).
The following shows center-of-gravity information for system components:
System Control Cabinet,
Fluoro UPS UL,
Fluoro UPS CE,
PDB UL,
PDB CE,
Tube Chiller Coolix 4100,
Detector Conditioner,
Omega IV Table,
Omega V Long Table,
Gantry,
Illustration 2-78
19" Desk Mounted Monitor,
Mavig Overhead Flat Panel Suspension,
Ergo Overhead Flat Panel Suspension,
Chapter 2 Equipment Requirements
Illustration 2-69
Illustration 2-70
Illustration 2-71
Illustration 2-72
Illustration 2-73
Illustration 2-74
Illustration 2-75
Illustration 2-76
Illustration 2-77
Illustration 2-79
Optima IGS 320, Optima IGS 330 Pre-Installation Manual
Direction 5537562-1-1EN, Revision 3
Illustration 2-80
Illustration 2-81
137

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima igs 330

Table of Contents