Hitachi Relion SAM600 Commissioning Manual page 8

Switchgear control unit
Table of Contents

Advertisement

Table of contents
5.5.2
When IED has front port with RJ-45..................................................................................25
5.6
Writing an application configuration to the IED................................................................... 30
5.7
Using the RTXP test switch ................................................................................................30
5.8
Checking the binary input/output circuits.............................................................................30
5.8.1
Binary input circuits........................................................................................................... 30
5.9
Checking optical connections..............................................................................................30
Section 6
Configuring the IED and changing settings..............................................33
6.1
Overview............................................................................................................................. 33
6.2
Supervision of input/output modules................................................................................... 33
Section 7
7.1
Overview............................................................................................................................. 35
7.2
Setting the station communication...................................................................................... 35
7.3
Verifying the communication .............................................................................................. 35
Section 8
Testing IED operation..................................................................................37
8.1
Preparing for test.................................................................................................................37
8.1.1
Requirements....................................................................................................................37
8.1.2
Preparing the IED to verify settings...................................................................................38
8.2
Activating the test mode...................................................................................................... 38
8.3
Preparing the connection to the test equipment..................................................................39
8.4
Connecting the test equipment to the IED...........................................................................39
8.5
Releasing the function to be tested..................................................................................... 40
8.6
Forcing of binary input/output signals for testing.................................................................41
8.6.1
Forcing concept.................................................................................................................41
8.6.2
How to enable forcing........................................................................................................41
8.6.2.1
8.6.3
How to change binary input/output signals using forcing.................................................. 41
8.6.3.1
8.6.4
8.6.4.1
8.6.4.2
Section 9
Testing functionality by secondary injection............................................45
9.1
Testing disturbance report................................................................................................... 45
9.1.1
Introduction........................................................................................................................45
9.1.2
Disturbance report settings............................................................................................... 45
9.1.3
Disturbance recorder (DR)................................................................................................ 45
9.1.4
Event recorder (ER) and Event list (EL)............................................................................ 46
9.2
9.3
Control.................................................................................................................................46
9.3.1
Apparatus control APC......................................................................................................46
9.4
Logic....................................................................................................................................46
9.4.1
Tripping logic, common 3-phase output SMPPTRC .........................................................46
9.4.1.1
9.4.1.2
2
Enable forcing using TESTMODE function block.........................................................41
Forcing by using PCM600............................................................................................41
Undo forcing by using TESTMODE component...........................................................43
Undo forcing by using PCM600................................................................................... 43
Three-phase operating mode.......................................................................................46
1ph/3ph operating mode ............................................................................................. 47
© 2017 - 2023 Hitachi Energy. All rights reserved
1MRK511447-UEN Rev. E
Switchgear control unit SAM600-IO
Commissioning manual