Section 7
7.1

Overview

The Ethernet ports are used for:
substation bus (IEC 61850-8-1) communication
7.2

Setting the station communication

To enable IEC 61850 communication, the corresponding ports must be activated. The rear access
points can be used for IEC 61850-8-1 communication. Redundant communication requires the use of
two Ethernet ports, when it is activated for an Ethernet port the next immediate port is selected as the
second Ethernet port and will become hidden.
To enable IEC 61850 station communication:
1.
Activate IEC 61850-8-1 (substation bus) communication.
Navigate to: Main menu /Configuration/Communication /Station communication/
IEC61850–8–1 /IEC61850–8–1:1
2.
Enable operation for Access Point 1 and 3 in the Ethernet configuration tool (ECT) in PCM600.
3.
Enable redundant communication for Acess point 1 using ECT.
7.3

Verifying the communication

To verify that the communication is working a test/analyzing tool, for example ITT600, can be used.
Verifying redundant IEC 61850-8-1 communication
Ensure that the IED receives IEC 61850-8-1 data on the selected Ethernet ports. Browse in the local
HMI to Main menu /Diagnostics /Communication /Ethernet status /Access point /
APStatusRedundant /RCHLCCH:1 and check that ChARedStatus and ChBRedStatus are shown
as Ok. This is only applicable if redundant communication is used. Remove the optical connection to
one of the Ethernet ports. Verify that either signal status (depending on which connection that was
removed) is shown as Error and the that other signal is shown as Ok. Be sure to re-connect the
removed connection after completed verification.
Switchgear control unit SAM600-IO
Commissioning manual
Establishing connection and
verifying the IEC 61850
communication
In this example access points 1, 2 and 3 are used. Access point 1 is always enabled by
default.
© 2017 - 2023 Hitachi Energy. All rights reserved

Establishing connection and verifying the IEC 61850 communication

Section 7
SEMOD172103-4 v9
SEMOD172108-3 v14
SEMOD172108-24 v12
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion sam600-io

Table of Contents