Extreme Networks ISW Series Installation Manual page 41

Managed industrial ethernet switch
Table of Contents

Advertisement

Install Your Switch
480 W AC-DC PSU
Part number 16920 is compatible with all ISW-Series switch models.
The AC-DC power interface is a 6-pin terminal block with polarity signs on the top panel
on most of the ISW-Series switches. The 6-pin terminal block contains an alarm contact
in the middle of the terminal block. The power interface for the ISW 24GbP, 4-SFP
model switch is a 4-pin terminal block with polarity signs on the rear panel.
Use the following steps to install the power supplies:
1. Verify that the power source circuit is de-energized.
2. Connect the DC output terminals on the power supply to the DC input terminals
on the switch. Insert the positive and negative wires into V+ and V- contacts on the
terminal block respectively and tighten the wire-clamp screws to prevent the wires
from being loosened.
See
Figure 14
supply. See the following illustrations for the location of the DC terminal inputs on
the switch.
3. Energize the power source circuit.
4. When power is connected, verify that the switch's PWR LED turns green. If the
PWR LED does not turn green, refer to
troubleshooting information.
Note
Connect the AC-DC power supply to a well-fused power source.
Figure 15: 6-pin Power Supply Terminal Block for the 8-port and 12-port Switches
on page 40 for the location of the DC output terminals on the power
ISW Series Managed Industrial Ethernet Switch Hardware Installation Guide
Connect Power Supplies to the Switch
System Status LEDs
on page 51 for
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isw-4w-4ws-4x isw-24w-4x

Table of Contents