5 Operation
5.5
Recommissioning after a longer
interruption
No special measures are necessary if recommissioning after a period of downtime of up
to one year. After longer periods of downtime, proceed according to
«4.2 Commissioning».
During commissioning, the underfeed combustion system must be inspected for proper
functionality without material.
Underfeed grate UTSP
1.10 en
D-49