1 Safety instructions
1.9
Operator workstations
Access to the system must be possible on all sides for the following tasks:
•
General operation
•
Fire monitoring
•
Flue gas duct cleaning and flue gas recovery
•
Cleaning of the combustion chamber
•
Maintenance work in the area of the fuel and air intake areas
•
Disposal of ash
•
Clearance area of the boiler door
Fig. 2
(x): This work area can be reduced after consultation.
Capacity (kW), in compliance
D-16
A
800
Workstation
with EN 303-5
180
240
300
360
450
500
550
700
900
A + 200mm
B
A (mm)
D (mm)
1600
1200
1600
1200
1800
1250
1800
1250
2300
1300
2300
1300
2300
1300
2700
1600
2700
1600
B (mm)
C (mm)
1150
2300
1150
2300
1250
2350
1250
2350
1440
2550
1440
2550
1440
2550
1600
3100
1600
3100
Underfeed grate UTSP
1.10 en