Routine Maintenance; Safety Instructions - Sungrow SG3150UD-MV-US System Manual

Mv grid-connected inverter
Hide thumbs Also See for SG3150UD-MV-US:
Table of Contents

Advertisement

11 Routine Maintenance

11.1 Safety Instructions

Risk of inverter damage or personal injury due to incorrect service!
Disconnect the switches between the product and all power supplies before
maintenance.
After the inverter is powered off for 5 minutes, measure the voltage and current
with measuring equipment. Only when there is no voltage nor current can oper-
ators who wear protective equipment operate and maintain the inverter.
The devices inside the inverter carry high voltage. Touching these devices may
lead to fatal electric shock.
Therefore,
Live line measurement can only be performed by professional personnel who
know the PV system well. Before measurement, be sure to take proper protec-
tion methods (e.g., wear insulating gloves, etc.).
During live line measurement, the operator must be accompanied by others to
ensure personal safety.
Electric shock or fire may occur due to device damage or system fault.
Visually inspect for device damages or other hazards before the operation
Check whether other external devices or circuit connections are in a safe state.
Make sure the device is in a safe state before operating.
76

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg4400ud-mv-us

Table of Contents