Anderson PBO92 Operation Manual

Advertisement

Quick Links

Anderson Thermal Solutions (Suzhou) Co., LTD
PBO92 Burner Operation Manual
No:
ATS–Operation Manual–PBO92
Subject::
PBO92 Burner Operation Manual
Version :
V1.0
Author :
Wilson Sun
Review :
David

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PBO92 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Anderson PBO92

  • Page 1 Anderson Thermal Solutions (Suzhou) Co., LTD PBO92 Burner Operation Manual No: ATS–Operation Manual–PBO92 Subject:: PBO92 Burner Operation Manual Version : V1.0 Author : Wilson Sun Review : David...
  • Page 2 Anderson Thermal Solutions – PBO92 Operation Manual CONTENT Disclaimer Notice ............................1 Liability And Warranty ..........................1 Safety Guide ..............................1 Fuel Information ............................2 Brief introduction ............................2 5.1 Burner Data ............................3 5.2 Burner Adjust ............................3 Burner maintenance ........................... 3 Spare part..............................
  • Page 3 Anderson warrants that the product itself will not infringe any patents. Every effort has been made to make this manual as accurate and complete as possible. If you find errors or omissions, please contact us so we can correct them.
  • Page 4 The PBO92 Series Oxy-Gas Pilot burner is patented by Anderson Thermal Solutions (Suzhou) Co., Ltd. for combustion control systems using oxy-gas. The PBO92 Series Oxy-Gas pilot burner is made of stainless steel with an operating temperature not above 1300 ° C. This burner is designed without spark plugs, with mounting port for flame detectors at burner back.
  • Page 5 For the first use, check that the seal of each interface is intact and not loose. After the burner is first used normally, the burner needs to be checked. The pilot burner is checked weekly in the first month, and at the second month, the inspection frequency can be extended to once in two weeks. Anderson Anderson Thermal Soluions(Suzhou)Co., Ltd...
  • Page 6 Anderson Thermal Solutions – PBO92 Operation Manual suggested that the burner check out at least once a month. Each inspection requires the inspection when the system is shut down and cool down to room temperature. Spare part For normal use and regular maintenance of the burner, we recommend preparing the following parts: None Anderson Thermal Soluions(Suzhou)Co., Ltd...
  • Page 7 Anderson Thermal Solutions – PBO92 Operation Manual 8. Appendix 8.1 Training Record Each trained person must verify that he has read and understood the contents of the operating manual and know how to operate and maintain this series of burners correctly.
  • Page 8 Anderson Thermal Solutions – PBO92 Operation Manual 8.3 Annual Audit Record Yearly audit list as follow but not only included Function Audit Date Inspector Problem description Next Audit Time Leak test Pressure switch test Cable and connectors Burner bodies and air wings Attention:...

Table of Contents