Sears 867.736349 Owner's Manual page 7

Gas.fired forced air wall furnace
Table of Contents

Advertisement

VERTICAL
VENT
INSTALLATION
Use a Type B-W gas vent installation
kit, Sears Stock
No. 42-99767 (Fig, 6).
VENT INSTALLATION
2 FEET
VENT TOP
COLLAR
4" IB-1
VENT PIPE
OVAL
TO ROUND
ADAPTER
BW VENT
BASE PLATE
CUT CEILING OPENING
Cut a ceiling
opening
14-3/8"
wide
by 3-5/8"
deep,
This must
be directly
above
support
brackets.
The
back
edge
of the opening
must
be flush with
the
wall
(Fig. 7),
INSTALL CEILING PLATE SPACERS
CEILING PLATE SPACERS
PLATE
HEADERS
SPACERS
CEILING
JOISTS
PARALLEL
TO
HOLE IN
CEILING
Two ceiling
plate, spacers are
in the B-W vent
kit.
They must be fastened
along
each tong edge of the
ceiling
hole to hold the oval vent pipe in the center
of
the hole (Fig. 7).
If your
ceiling
joists
run at right
angles
to the wall
and are in line with the studs, nail the plate
spacers
to the ]oists.
Be sure they tine up with the long edges
of the holes.
If the joists
run
parallel
to the
wall,
install
2"×6"
headers between
two joists
as shown in Fig. 7. If the
joists and
studs
do not.line
up, install
headers
as
required
to support
the plate
spacers.
INSTALL FURNACE VENT
Remove two screws in vent support assembly (Fig.
8). Discard
the vent support.
Attach
the bottom
plate, ftue collar, seal, and base plate from B-W gas
vent kit to the top support on wall (Fig. S).
VENT SUPPORT
SEAL
COLLAR
VENT
SUPPORT
DISCARD
BoI'rOM
PLATE
II
III IIIII IIIIII
lie
Lower a 4 foot length of oval, double wall vent pipe
through the ceiling
hole to the base plate. The first
length of pipe must reach from the base plate to at
least 6 inches above the ceiling
(Fig. 6). if it does not,
you must
use a longer
length.
Force the vent
pipe
into the base plate.
Be sure the seal is in place.
Lock
the pipe to the base plate with screws furnished
in
the B-W gas vent kit.
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

867.736389

Table of Contents