Trane Performance Climate Changer UCCA Series Installation, Operation And Maintenance Manual page 32

Table of Contents

Advertisement

Installation - Mechanical
Roof hook
Trim angle
2. Remove the shipping supports from the pipe cabinet.
3. Apply Butyl tape to the unit baserail roof curb notches (tape
must extend beyond the notch) on both sides, and peel off
liner). Remove screw from baserail that will interfere with
trim angles.
4. Apply Butyl tape to the back of pipe cabinet side wall (full
height of the side wall along the outer edge to base) and
roof (full length of the roof along the outer edge), and peel
off the liner. Strips of tape must contact each other at
intersections. Tape must contact gasket.
32
Shipping
supports
Butyl tape must
contact gasket
Butyl tape
Remove screws
(outside the pipe cabinet)
Strips of tape must
contact each other
at intersections
Butyl tape
with liner
5. Lift the pipe cabinet using the side lifting lugs. Tuck the pipe
cabinet roof underneath the unit roof overhang.
Unit roof
overhang
Pipe cabinet
roof
Lifting lug
6. Place the pipe cabinet against the unit and push firmly to
squeeze Butyl tape.
Pipe
cabinet
Unit
7. Maker sure there is a gap between pipe cabinet and bottom
deflectors.
1 5/8-in. ± 1/8-in. gap
between pipe cabinet
and horizontal deflector
CLCH-SVX009L-EN

Advertisement

Table of Contents
loading

Table of Contents