Trane 2TEE3C31A1000A Installer's Manual page 20

Convertiblevariable speedcommunicating air handlers 2 112- 5 ton
Hide thumbs Also See for 2TEE3C31A1000A:
Table of Contents

Advertisement

CHECKOUT
PROCEDURES
After installation
has been completed,
it is recommended
that the Air Handler
be checked
against
the following
checklist.
1.Make
sure
power
is "OFF"
at
power
disconnect
switch ........................................................................
[
]
2.Check all field wiring
for tight connections.
See that
grounding
of unit is in accord with code .................
[
]
3.Make
sure unit suspension
(if used)
is secure
and
that there are no tools or loose debris in, around or on
top of the unit ...........................................................
[
]
4.Check all duct outlets;
they must be open and unre-
stricted ......................................................................
[
]
5.Cheek
drain
lines
and
be
sure
all joints
are
tight ..........................................................................
[
]
6.Make sure secondary
drain pan is installed
......... [ ]
7 ..... Cheek power supply for correct requirements
per
unit nameplate
.........................................................
[ ]
8.Check filters for proper
size. Inform owner of proper
procedure
for removal
and reinstallation
...............
[ ]
9.Energize
the system and carefully
observe its opera-
tion; make any necessary
adjustment
....................
[ ]
10 .... Instruct
owner, engineer
(if applicable)
on proper
operating
procedure
and leave Use and Care Manual
with owner ................................................................
[ ]
SUPPLEMENTARY
HEATERS
CHECKOUT
PROCEDURES
IF A HEATER IS USED, SEE "LIMITATIONS AND RECOMMENDATIONS"
TO DETERMINE IF THE HEATER REQUIRES A SPECIAL CIRCUIT.
1. Be sure the disconnect
switch is "OFF", and safety label (if any) is attached
...............................
[
]
2. Check on field wiring for tight connections
and grounding
according
to codes ............................
[
]
3. Check circuit protection
for proper
size per nameplate
specifications
..........................................
[
]
4. Check control box panel -- in place and secured ...........................................................................
[
]
NOTE: OPERATION OF HEATERS MUST BE CHECKED DURING THE OPERATION CHECK OF THE
TOTAL SYSTEM.
Trane
6200 Troup Highway
Tyler, TX 75707
For more information contact
your local dealer (distributor)
03/08
The manufacturer
has a policy of continuous
product
and product
data improvement,
and it reserves
the
right to change
design
and specifications
without notice.

Advertisement

Table of Contents
loading