Step 5: Frame Assembly - Arrow Storage Products WR82 Series Owner's Manual & Assembly Manual

Table of Contents

Advertisement

Step 5: Frame Assembly

You will need for this page:
SB
SS
(QTY: 8)
(QTY: 2)
Do NOT fasten your Floor Frames to your Base at this time.
You will anchor your building after it is erected. If using a
Floor Frame Kit, you must wait until after assembly to install it.
1
Assemble Floor Frame with two (2) Small Screws at each
corner as shown. At the front corners insert one (1) Small
Bolt and Nut through the bottom of the Frame as shown.
8984
FRONT
Front Corner
Insert a bolt and nut thru bottom of
Front Floor Frame at each front corner
to secure Front Frame to Side Frames.
The Floor Frame must be BOTH square AND
level or the holes will not line up properly.
Do not continue beyond this point unless you have enough time to complete the
shed today. The remainder of assembly may take several hours and requires at
least two people. A partially assembled shed left overnight can be seriously damaged by
even light winds. It is recommended that you wait and complete the remainder of shed
assembly on a day which you have plenty of time to fi nish the shed safely and completely.
2
Assemblies from Step 1:
8984
Front Floor Assembly (1)
Rear Floor Assembly (1)
Side Floor
Frame
8984
Back Corner
18
Overlap Floor Frames as shown. Set Floor
Frame with large holes on top at each corner.
When diagonal measurements
are equal, the Frame is square.
18AE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vd82a

Table of Contents