General; General Information; Transport Within The Site; Location - Swegon ESENSA PX TOP 05 Installation Instructions Manual

Hide thumbs Also See for ESENSA PX TOP 05:
Table of Contents

Advertisement

1. General

1.1 General information

All staff must consult the instructions before starting any work
on the unit. Any damages to the unit (or parts of it) due to a
misuse cannot be considered subject to guarantee.
All electrical work must be carried out by a qualified electrician.
Make sure that the unit is disconnected from any power supply
before performing any electrical work.
Check the condition of the unit on delivery.
is supplied in packaged condition.
(sharp tools could damage the surfaces). The surfaces are
covered with a transparent protective film. Please remove it
carefully.
If the unit is not installed immediately, it should be stored in a
clean and dry area. If stored externally, it should be adequately
protected from the weather conditions.
Duct connections/duct ends should be covered during storage
and installation, in order to avoid dust or dirt entering the unit.
The product identification can be found on the silver label that
is always stuck to the bottom of a front panel on the unit.Refer
to this label when you contact the supplier.
Ordered optional accessories are not factory installed and must
be ordered in advance (for example internal and external coils,
motorised dampers, defrost kit and flexible sleeve). They are
supplied separately from the unit so the installer is responsible
for installing and connecting these.
Standard components can be individually packaged and
placed inside the unit for the transportation.

1.2 Transport within the site

Before removing the transport pallet, determine whether
a forklift truck or a pallet transporter will be used for further
transporting the unit within the site to the spot where it will
be installed.
CAUTION
: The unit is attached to the pallet at the feet by
metal parts. Unscrew the fasteners before removing the device
from the pallet.
4
www.swegon.com
The air handling unit
Please unpack it carefully

1.3 Location

The air handling unit must be installed inside the building
(some specific models are designed to be also placed outside)
and mounted horizontally on a flat and firm supporting surface
(perfectly level floor)and this surface must be constructed
in a way enabling it to support the weight of the unit. If this
conditions are not respected, that could cause an issue for the
drain-pan.

1.4 Lifting

The ESENSA unit is equipped with perforated feet for easy
handling.
CAUTION
: The unit is attached to the pallet at the feet by
metal parts. Unscrew the fasteners before removing the device
from the pallet.
To lift the device, use proper lifting ropes (not provided):
1-
Insert
2
lifting
bars
the
perforations
in
Maximum diameter of 42
are strong enough.
2- The tense lifting ropes could apply a pressure on the edge of
the unit and could deform it. For this reason, we advice to use
(wooden) lifting beams (on the top of the unit) to release the
pressure between the ropes.
We reserve the right to alter specifications.
GB.ESENSA.MI.230612
(not
provided)
through
the
feet
of
the
mm. Make sure that the lifting bars
unit.