Download Print this page

Advertisement

Quick Links

PREVENTIVE MAINTENANCE SCHEDULE
Maxi Move
001.25065.EN Rev 9 • 2023-06

Advertisement

loading
Need help?

Need help?

Do you have a question about the Maxi Move and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Arjo Maxi Move

  • Page 1 PREVENTIVE MAINTENANCE SCHEDULE Maxi Move 001.25065.EN Rev 9 • 2023-06...
  • Page 2 © Arjo 2023. As our policy is one of continuous improvement, we reserve the right to modify designs without prior notice. The content of this publication may not be copied either whole or in part without the consent of Arjo.
  • Page 3: Preventive Maintenance Schedule

    Arjo dealer. NOTE: Unauthorized modifications on any Arjo equipment may affect its safety. Arjo will not be held responsible for any Means: This is important information regarding the accidents, incidents or lack of performance that occur as correct use of the equipment.
  • Page 4 Preventive Maintenance Schedule DPS Spreader Bars Loop Spreader Bars Manual Powered 2-4 Point Stretcher Action Visually inspect the condition of all sling attachment points for damage. If any is found, replace with new unit. Make sure all instruction labels are attached and readable.
  • Page 5 “T” part on the jib. Visually inspect to make sure the leaf spring within the locking clip is correctly installed. See Fig. 6. Maxi Move Accessories Slings Battery Charger Action Examine for damage/fraying to sling, straps and clips; replace as required.
  • Page 6 Preventive Maintenance Schedule Maxi Move Accessories Slings Battery Charger Action Recharge battery for a minimum of 15 hours once every seven days. See “Operating Instructions” for battery charging procedure. Operate the lift through its full range from both the control panel and the control handset in a normal and smooth manner.
  • Page 7 Preventive Maintenance Schedule Maxi Move Accessories Slings Battery Charger Action Test the “Immediate Stop” facility. See Note 2. Mechanically test the “System Failure Wind Down” facility. See Note 3. Where a scale is installed, check the accuracy of the unit and recalibrate if required.
  • Page 8 Preventive Maintenance Schedule Maxi Move Accessories Slings Battery Charger Action Check and lubricate the upper and lower mast sliders. Replace if worn or damaged. If necessary, adjust to remove excessive gap in the column. Check and replace as necessary the 4 jib rollers and 2 guide blocks if they show signs of wear or damage.
  • Page 9 NOTE: For a full list of spares and spares Press the reset button for five seconds to set the packages, please refer to the “Maxi Move usage counter back to zero. A series of beeps will Parts List” 001.25070.EN. That manual is confirm that the usage counter was reset.
  • Page 10 Notes Typical Pivot Point Torque Tightening Aluminium Leg Friction disc C x 2 A x 1 B x 2 Steel Leg Extra Low Height Leg D x 2 E x 2 Bushing Fig. 8 Fig. 5 Jib Pivot Typical Lifting Attachment Using a Leaf Spring and Locking Clip (Combi system) Locking clip Pivot point...
  • Page 11 AUSTRALIA FRANCE POLSKA Arjo Australia Arjo SAS Arjo Polska Sp. z o.o. Building B, Level 3 2 Avenue Alcide de Gasperi ul. Ks Piotra Wawrzyniaka 2 11 Talavera Road CS 70133 PL-62-052 KOMORNIKI (Pozna ) Macquarie Park, NSW, 2113, Australia...
  • Page 12 At Arjo, we believe that empowering movement within healthcare environments is essential to quality care. Our products and solutions are de- prevention of pressure injuries and venous thromboembolism. With over 6500 people worldwide and 65 years caring for patients and healthcare professionals, we are committed to driving healthier outcomes for people facing mobility challenges.