Securing Fireplace To Floor Or Framing - Majestic DVLB7 Series Manual

Direct vent gas fireplace
Table of Contents

Advertisement

SecurInG FIrepLace to FLoor or FramInG

The fireplace must be secured to the floor and/or to framing studs as shown in Figure 5. Use two
() wood screws or masonry/ concrete screws to secure fireplace to the floor. Use four (4) screws
to attach fireplace to framing. The side nailing flanges are 1/" or 5/8" to accommodate different
wall thickness.
Screw
Figure 5 -
Securing Fireplace to Floor
and Framing Studs
FInIShInG materIaL
note: Any remote wiring (i.e. remote control, wall switch, and optional fan) must be done prior to
final finishing to avoid costly reconstruction.
Only noncombustible materials (i.e. brick, tile, slate, steel, or other materials with a UL fire rating
of Zero) may be used to cover the black painted face of the appliance. It is permissible to bring
combustible wall board to the top and side edges of the black painted face. A 300°F minimum
adhesive may be used to attach facing materials to the black surface. If joints between the finished
wall and the fireplace surround are sealed, a 300°F minimum sealant material (General Electric
RTV103 or equivalent) must be used.
10
All manuals and user guides at all-guides.com
Drywall Support Tabs
(Do not use for
framing or header)
Nailing Flange
Nailing Flange
Screws
FP2335
nailing flanges
DVBL7 Series Gas Fireplace
Framing
Nailing
Flanges
FP335
Screw
74D3001

Advertisement

Table of Contents
loading

Table of Contents