Appendix: Single Line Diagrams
Home Back-Up Using Parallel Systems (25 kVA | 40 kWh)
1
2
INTER-DISCIPLINE REVIEW
THIS DRAWING WAS PREPARED BY SAVANT
POWER. FOR A SPECIFIC PROJECT,
DISC
ARCH
CIVIL
ELECT
TAKING INTO CONSIDERATION THE SPECIFIC
AND UNIQUE REQUIREMENTS OF THE PROJECT.
REUSE OF THIS DRAWING OR ANY INFORMATION
DATE
*
*
*
CONTAINED IN THIS DRAWING FOR ANY PURPOSE
Savant Power Storage 20 Installation Guide
IS PROHIBITED UNLESS WRITTEN PERMISSION
FROM RACEPOINT ENERGY
INIT
*
*
*
GRANTED.
009-2401-00 | 090623
3
I&C
MECH
STRUCT
*
*
*
B
DC BATTERY UPDATE
A
FINAL CONCEPT TEMPLATE
*
*
*
REV
REVISIONS
4
5
DSGN
DRN
MAW
8/1/23
CKD
JP
8-1-2023
MAW
SCALE:
AS NOTED
7-12-2023
MAW
DATE
DRN
DSGN
CKD
APPD
- 35 -
6
7
200A POWER STORAGE 20 SYSTEM NOTES
1.
UTILITY CT
METER
2.
M
3.
EXISTING
LOADS
EXISTING
LOADS
4.
EXISTING
LOADS
5.
EXISTING
LOADS
GENERAL NOTES
1.
2.
3.
4.
5.
SAVANT POWER
RESIDENTIAL MICROGRID
-
-
Copyright 2023 Savant Systems, Inc
200A: 25KW - 40KWH ESS
-
PS20 ONELINE DIAGRAM
CERTIFICATE OF REGISTRATION NO. X-0000
8
40KWH RATED ENERGY
STORAGE
25KW / 104A OFFGRID
CONTINUOUS
QTY (4) 8.5KW / 26A DC PV
MPPT
A
QTY (2) 12.5KW GEN INPUTS
OR AC COUPLED PV INPUTS
48KW / 200A GRID PASS
THROUGH
CONCEPT ONLY: NOT FOR
CONSTRUCTION OR PERMIT
SUBMITTAL.
AS A BASIS FOR THE
MINIMUM INSTALLATION
CRITERIA, ENGINEER OF
RECORD (EOR) IS TO
ENSURE THAT ALL WORK
MUST BE PERFORMED IN
ACCORDANCE WITH THE
B
LATEST EDITIONS OF THE
STATE BUILDING CODE,
STATE ELECTRICAL CODE,
NFPA, ANSI/NECA
INSTALLATION STANDARDS
AND OTHER APPLICABLE
CODES, REGULATIONS AND
LAWS OF LOCAL, STATE AND
FEDERAL GOVERNMENT,
OTHER AUTHORITIES HAVING
JURISDICTION AND
APPLICABLE BASE BUILDING
STANDARDS AND
SPECIFICATIONS.
THESE DRAWINGS
ILLUSTRATE A CONCEPT
SHOWING MAJOR
C
EQUIPMENT AND
INTERCONNECTIONS BUT
ARE NOT TO BE CONSIDERED
FABRICATION / SITE
SPECIFIC DRAWINGS. CABLE
SIZING, SHORT CIRCUIT,
GROUNDING, OVERCURRENT
PROTECTION AND
DISCONNECTING MEANS TO
BE DESIGNED BY EOR WITH
PE STAMPED SITE SPECIFIC
CONTRACT DRAWINGS.
EOR TO ENSURE FINAL
SYSTEM DESIGN ADHERES
TO ALL APPLICABLE
ARTICLES OF NEC INCLUDING
D
ARTICLES 110, 240, 250, 310,
480, 690, 702, 705, 706 AND
750.
REFER TO POWER STORAGE
20 SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
JOB NUMBER
REV
-
B
DRAWING NUMBER
E00-001 SH 1