3.4. Battery System Installation

1.
Open the Battery Access Door with a hex screwdriver.
2.
Number all battery labels with a number 1-8.
3.
Install battery 8 in the bottom battery slot. Then continue to install all batteries in ascending slots in reverse numerical order, with battery 8 on
the bottom and battery 1 in the top. See the diagram below for reference.
NOTE: Always keep the batteries connected in the order that they were originally installed.
4.
Fasten all modules on both sides using M4x8 screws. Torque: 10 lb-in (1.2 N*m).
NOTE: Do not install the door on the cabinet until installation has been completed and the system has been tested for proper function.
1
Savant Power Storage 20 Installation Guide
009-2401-00 | 090623