Each Energy PHS3K-M1A User Manual page 47

Table of Contents

Advertisement

and press ESC to return to the previous menu.
6.2.5.15 Export Limit
->Soft Limit
->Limit Mode
->Hard Limit
->Table Set
The inverter's export limit can be achieved together with external devices
such as a CT or meter. There are two types of limit, soft limit and hard
limit. The soft limit means that the limit is controlled by software, and
hard limit means that if the generation exceeds the limit, the inverter will
stop working. Under the detection mode menu, you can choose CT mode
or meter mode. For the normal working of inverters, please use the soft
limit only. The hard limit is used only by compulsory requirement of local
grid companies.
The generation limit equals Pmax limit (limit the max output power of the
inverter) as described in the manual. The Export limit (limit the export
Mode:
ON
Value:
6000
Detection Mode
METER MODE
Mode:
ON
Value:
5800
->charge Time
->Export 1 Power
->Dischar Time
->Export 2 Power
45

Advertisement

Table of Contents
loading

Table of Contents