Page 1
IN221000607V01_GL 000-000 84C-363V00 EN_IMPORTANT, RETAIN FOR FUTURE REFERENCE: READ CAREFULLY. FR_IMPORTANT:A LIRE ATTENTIVEMENT ET À CONSERVER POUR CONSULTATION ULTÉRIEURE. ES_IMPORTANTE, LEA Y GUARDE PARA FUTURAS REFERENCIAS. PT_IMPORTANTE, RETER PARA REFERÊNCIA FUTURA: LEIA ATENTAMENTE. DE_WICHTIG! SORGFÄLTIG LESEN UND FÜR SPÄTER NACHSCHLAGEN AUFBEWAHREN.
Page 10
M8*175 M8*45 M8*55 M8*65 Φ20*1.4 M6*40 M6*65 M5*30 M5*50 M4*25 M4*50 173*173 160*160 300*93 Φ8*180 M6*89 M4*60 M6*65 Φ8*30 200*100 300*67 asphalt tile NOTE EN_Do not confuse similar screws.Do not tighten bolts fully until all parts are connected! FR_Ne pas confondre des vis similaires.Ne serrez pas les boulons à fond tant que toutes les pièces ne sont pas connectées! ES_No confunda tornillos similares.No apriete los tornillos completamente hasta que todas las partes están conectadas!
Page 11
STEP2 STEP1 M5*30 173*173 160*160 M8*45 300*67 Insert screws from this side Insert screws from the short side...
Page 12
M8*55 300*93 Insert screws from this side Insert screws from the short side M8*175 Φ20*1.4...
Page 16
EN_ First, put the asphalt tile W on the front of roof QQ and TT Then NN, OO,MM cover the asphalt tile ,to avoid leak the water M4*25 FR_ D'abord, mettez la tuile d'asphalte W sur le devant du toit QQ et TT. Ensuite, NN, OO, MM couvrent la tuile d'asphalte pour éviter les fuites d'eau.
Page 17
M4*25 M4*50 #MM top cover asphalt shingles, STEP1 and long side facing outwards M4*60 Step1: #MM cover at the top. Repeat the previous step, put the #LL strip, screw #T, #L screws, align the #OO, #NN cover with the top plate and the beveled side, 200*100 then screw #M screws...
Page 19
Φ8*180 M6*89 #S hooks can be freely assembled under the wooden beam *You can choose where to mount the hooks according to your needs, but be careful when screwing the hooks into the wood or you may crack the wood slightly...
Need help?
Do you have a question about the 84C-363V00 and is the answer not in the manual?
Questions and answers