5. APsystems microinverter system operating instructions

To operate the APsystems microinverter PV system:
1. Turn ON the AC circuit breaker on each microinverter AC branch circuit.
2. Turn ON the main utility-grid AC circuit breaker. Your system will start producing power after approximately
one minute of waiting time.
3. Microinverter data will be available in the EMA Manager APP or in the EMA web portal.
Alternatively, LED sequences could be an indicator of microinverters status (see section 6.1)
Once the ECU has been commissioned properly, the APsystems Microinverters will start to send
performance data to the ECU. The time required for all of the Microinverters in the system to report to
the ECU will vary depending on the number of Microinverters in the system.
APsystems Microinverter QT2-220 User Manual
15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QT2-220 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents