DREAMS Yardley Ottoman Double Assembly Instructions Manual

DREAMS Yardley Ottoman Double Assembly Instructions Manual

Hide thumbs Also See for Yardley Ottoman Double:

Advertisement

Quick Links

Yardley Ottoman
Double
3/4 hour approx
Two person
assembly time
assembly

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Yardley Ottoman Double and is the answer not in the manual?

Questions and answers

Summary of Contents for DREAMS Yardley Ottoman Double

  • Page 1 Yardley Ottoman Double 3/4 hour approx Two person assembly time assembly...
  • Page 2 • Always ensure that the ottoman is FULLY opened before accessing the storage area. • Do not exceed the maximum weight as specified in the table below: Piston Min Mattress Max Mattress Bed Size Strength Weight (kg) Weight (kg) (N/M) Single Yardley Double Yardley Ottoman Double - Assembly Guide - Page 2...
  • Page 3: Assembly Tips

    To keep your little ones busy, there is a colouring page inside the back cover. Help and support At Dreams, it’s our mission to give the whole nation a great night’s sleep - this means that the quality of our products is of utmost importance to us. If there are any issues with your product or any missing parts, please contact our Help Centre on 0800 652 6750, where a member of our team will be happy to help.
  • Page 4: Parts List

    Fabric base x 1 pc Footboard x 1 pc Metal slats frame x 1 pc Left siderail x 1 pc Gas piston x 2 pcs Right siderail x 1 pc Support bar x 1 pcs Yardley Ottoman Double - Assembly Guide - Page 4...
  • Page 5: Tools Required

    Flat Washer Nut (M8) Nut (M8) Black Soft Mat Centre support leg K x 2 Nuts (M8) 10 10 Tools required Please check you have all these below: Tape measure Scissors Yardley Ottoman Double - Assembly Guide - Page 5...
  • Page 6 Turn the bed on its side and attach the fabric base to the bottom of the side rails, headboard and footboard. Note: Make sure the fabric is fixed evenly all around. Yardley Ottoman Double - Assembly Guide - Page 6...
  • Page 7 Unfold the metal slats frame. Put the support bar to the metal slats frame, and tighten the bolts. Attached the centre support leg into the metal slats frame, and tighten the bolts. Yardley Ottoman Double - Assembly Guide - Page 7...
  • Page 8 Don't over tighten, a small gap is left so stem can move freely. NOTE: When fully assembled and the mattress is in position, please raise and lower the ottoman 4-5 times. To ensure the gas pistons are fully lubricated. Adjustable Foot Yardley Ottoman Double - Assembly Guide - Page 8...
  • Page 9 Ottoman support bar - always engage the support bar when accessing the ottoman storage area. • Read all instructions provided before using your Ottoman bedframe. Please save and retain the instructions for future reference. Yardley Ottoman Double - Assembly Guide - Page 9...
  • Page 10 • Before removing the mattress secure the frame to ensure it does not open unexpectedly. • Do not attempt to lie on the mattress when the ottoman is in the raised position. • When lifting the ottoman remove all bedding except the fitted sheet. Yardley Ottoman Double - Assembly Guide - Page 10...
  • Page 11: Care And Maintenance

    Metal tends to be more resilient to everyday wear and tear. We recommend to gently dust your metal furniture and keep it dry to maintain its look. Thank you for shopping with us - we hope you have a great night's sleep Yardley Ottoman Double - Care and maintenance - Page 10...
  • Page 12 Little dreamers Keep the little ones entertained while you assemble your new purchase.

Table of Contents