Download Print this page

Vaxcel T0575 Assembly And Installation Instructions

Advertisement

Quick Links

ASSEMBLY AND INSTALLATION
T0575 / T0576
WARNING:
NOTE: 1. Before installing, consult local electrical codes for wiring and grounding requirements.
2. READ AND SAVE THESE INSTRUCTIONS.
Hardware Package (
AA
BB
CC
Important to Know
1. Read all instructions carefully before installation and operation.
2. If you are not familiar with state and local electrical codes, it is
recommended that you consult with a qualified electrician.
3. Before installation, shut off power at the main fuse or circuit
breaker box. Be aware that simply turning off the wall switch is
not sufficient to prevent an electrical shock.
4. This fixture requires a 120 VAC, 60 Hz power source.
5. Do not attempt to take the lantern apart; there are no
serviceable parts inside.
6. To avoid sensor damage by lightning or electrical surge, make
sure the grounding wire is securely connected.
7. For general safety and to avoid any possible damage to the
sensor, be sure the power is switched "off" before replacing the
bulb.
8. Compatible with LED dimmable bulb.
Maximum Wattage: 60W
Work Temperature: -4°F~104°F
INSTRUCTIONS
TO AVOID RISK OF ELECTRICAL SHOCK, BE SURE TO SHUT OFF
POWER BEFORE INSTALLING OR SERVICING THIS FIXTURE.
):
included
Cross Bar Unit
X1
Mounting Screw
X2
Wire Connector
X3
Incandescent
Bulb or 20W LED
Dimmable Bulb
DD
EE
Features
1. Energy saving fixture.
2. Use dim-to-full brightness where
dim-illumination is preferred, such as your
front entrance. Use off-to-full brightness
where off/on illumination is preferred, such
as your backyard.
3. When in manual override mode, use wall
switch to keep the light ON till dawn.wn.
Page 1 of 5
Ball Nut
X2
Rubber Pad
X2
200313

Advertisement

loading

Summary of Contents for Vaxcel T0575

  • Page 1 ASSEMBLY AND INSTALLATION INSTRUCTIONS T0575 / T0576 WARNING: TO AVOID RISK OF ELECTRICAL SHOCK, BE SURE TO SHUT OFF POWER BEFORE INSTALLING OR SERVICING THIS FIXTURE. NOTE: 1. Before installing, consult local electrical codes for wiring and grounding requirements. 2. READ AND SAVE THESE INSTRUCTIONS.
  • Page 2: Installation Steps

    Installation Steps Turn off the power at fuse or circuit box. 2. Attach the tail and pipe cap 1. Screw one end of the threaded through the threaded pipe, then Fixture pipe into the coupling and secure them with the finial. secure it with a hex nut.
  • Page 3: Function And Operation

    The Position of Control Panel View Fig.A Sensor Sensor Lens Lens Fig.1 Fig.3 Fig.2 “TIME” Knob Step 1: Rotate the sensor lens from left side to right side “LOW LEVEL” Knob to show the adjustable knobs and slide switch. “SENS” Knob (See Fig.1) Small Screwdriver (not included)
  • Page 4 Least sensitivity The following parts are available for reorder if damaged or missing. Call our toll free at 1-800-482-9235. Spare Parts List: Assembly Kit 4860MM (1 SET) FOR T0575 4859MM (1 SET) FOR T0576 Cross Bar Unit Ball Nut Set Screw...
  • Page 5: Troubleshooting

    TROUBLESHOOTING Refer to following information to solve your problems. SOLUTION DAY/NIGHT SYMPTOM POSSIBLE CAUSE Slide switch is not set in the test Set the slide switch in the test mode for testing. mode. Wall switch or circuit breaker is off. Turn on wall switch or circuit breaker.

This manual is also suitable for:

T0576