Fronius Primo GEN24 10.0 Plus Operating Instructions Manual page 81

Hide thumbs Also See for Primo GEN24 10.0 Plus:
Table of Contents

Advertisement

1
BAT+
BAT-
BAT PE
1
2
1
BAT+
BAT-
Manually push the battery cables
through the DC bushings.
* The battery ground conductor must
be connected externally (e.g. switch
cabinet). When connecting an LG
RESU FLEX battery, the battery
ground conductor can be connected in
the inverter (see chapter
the LG RESU FLEX ground conductor
on page 84. Observe the minimum
cross section of the ground conductor
2
to the battery.
IMPORTANT!
Before stripping the insulation, push
the cables through the DC bushings to
prevent individual wires being bent or
broken.
2
Connecting
81

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primo gen24 8.0 plus

Table of Contents