I/O Power Management Settings - 1 Relay; Autotest (Cei 0-21) - Fronius Primo GEN24 10.0 Plus Operating Instructions Manual

Hide thumbs Also See for Primo GEN24 10.0 Plus:
Table of Contents

Advertisement

I/O power man-
I/O Power Management
agement set-
tings - 1 relay
DNO Feedback
not used
DNO Rules
Autotest
Description
(CEI 0-21)
The
standards for monitoring the voltage and frequency limit values of the inverter
during commissioning. In normal operation, the inverter constantly checks the
current voltage and frequency actual value of the grid.
After starting the autotest, various individual tests run automatically one after
the other. Depending on network conditions, the duration of the test is about 15
minutes.
IMPORTANT!
The inverter may only be commissioned in Italy after an autotest has been suc-
cessfully performed (CEI 0-21). If the autotest is not passed, feeding energy into
the grid is not permitted. Once the autotest is started, it must be completed suc-
cessfully. The autotest cannot be started during backup power operation.
U max
U min
f max
f min
f max alt
V+/GND
IO
v
v
0
2
4
6
+
+
1
3
5
7
GND
GND
Rule 1
0
2
4
6
8
1
3
5
7
9
Active Power
100
Power Factor (cos φ)
1
cap
DNO Feedback
Rule 2
0
2
4
6
8
1
3
5
7
9
Active Power
0
Power Factor (cos φ)
1
cap
DNO Feedback
IMPORT
EXPORT
"Autotest"
can be used to check the protection function required by Italian
Test for checking the maximum voltage in phase conductors
Test for checking the minimum voltage in phase conductors
Test for checking the maximum grid frequency
Test for checking the minimum grid frequency
Test for checking an alternative maximum grid frequency
I
8
10
9
11
10
11
10
11
None
0
None
1
2
None
3
None
None
4
None
5
6
None
7
None
IO control
8
9
None
10
None
None
11