Testing backup
After the initial installation and configuration of the backup power operation, it is
power mode
recommended to test the backup power operation. For test mode, a battery
charge of min. 30 % is recommended.
A description on how to run test mode can be found in the
list
94
(https://www.fronius.com/en/search-page, item number: 42,0426,0365).
backup power check-