TP-Link Omada SG2218P Installation Manual page 11

Smart switch
Table of Contents

Advertisement

Figure 2-1
Desktop Installation
Rack Installation
To install the device in an EIA standard-sized, 19-inch rack, follow the instructions described below:
1. Check the efficiency of the grounding system and the stability of the rack.
2. Secure the supplied rack-mounting brackets to each side of the device with supplied screws, as
illustrated in the following figure.
Figure 2-2
Bracket Installation
3. After the brackets are attached to the device, use suitable screws (not provided) to secure the
brackets to the rack, as illustrated in the following figure.
Figure 2-3
Rack Installation
Caution:
Leave 5 to 10 cm gaps around the devices for air circulation.
Avoid placing heavy things on the device.
Place the device with its bottom facing downwards.
Mount devices in sequence from the bottom to top of the rack and ensure a certain clearance
between devices for the purpose of heat dissipation.
Omada Smart Switch
Feet
Bottom of the Device
Notch
Rack-mounting Bracket
Screw
*This image is for demonstration only
Rack
Installation
08

Advertisement

Table of Contents
loading

This manual is also suitable for:

Omada sl2428pOmada sg2428pOmada sg2210mpOmada sg2218

Table of Contents