Download Print this page

Cembre LD-1PY-ECO Operation And Maintenance Manual page 25

Rail drill

Advertisement

When work has been completed, put away the drill by proceeding as follows:
13.1) Depressurise the tank of the SR5000 cooling unit (see § 4), close the tap (02) on
the tube from the tank, and disconnect the quick-coupling (03).
13.2) Carefully clean the drill, particularly in the spindle area, removing machining waste
(swarf, etc.) and any deposits of lubricating coolant.
13.3) Fully withdraw the spindle.
13.4) Place the drill and the SR5000 cooling unit in a sealed place free from dust, moisture
and the risk of accidental impact.
For better protection CEMBRE recommends the use of the VAL LD metal case designed for this
purpose (see § 3.5). The DBG-Y moving arm device allows the drill to be housed and locked in
the case. A suitable housing is also provided in this VAL LD for the VAL MPA box containing the
most commonly used accessories.
VAL MPA
DRILL
FIG. 21
STORAGE CASE
25
13. STORAGE THE DRILL
DBSN
VAL LD

Advertisement

loading

This manual is also suitable for:

Ld-1pygr-eco