WORKMASTER GO-A8-PW Operator's Manual page 33

Hide thumbs Also See for GO-A8-PW:
Table of Contents

Advertisement

7.
After the Impactor has been assembled, pour 2 oz. (6-8 squirts) of TOOL-
LUBE air tool oil (supplied) in the Air Inlet to ensure immediate lubrication
of the complete tool.
8.
Before installing Impactor into Cart Frame, operate Impactor for a
short period (3 to 5 minutes) of time to test for proper operation.
9.
Check the free speed at the ANVIL (36) with a tachometer. Speed is
1500 RPM (approx.) at 85 PSI using 150 CFM (approx.).
28

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GO-A8-PW and is the answer not in the manual?

Table of Contents