Pre-Start Check List - WORKMASTER GO-A8-PW Operator's Manual

Hide thumbs Also See for GO-A8-PW:
Table of Contents

Advertisement

VI. PRE-START CHECK LIST
1.
Fill the In-Line Lubricator with the air tool oil supplied. See Section VII:
Lubrication for details.
2.
With air pressure OFF, install Capstan Drive Fitting making sure that the
Pin Retainer and O-Ring are properly seated.
3.
Check In-Line Lubricator to insure proper oil level.
4.
Connect all air hoses and make sure all controls are locked and properly
secured.
5.
When using new air hose, blow lubricated air through the hose to
completely coat the inside with oil. This may take up to 10 minutes.
6.
Each day, before opening any car gates, operate the GO-A8, free-speed,
for about 5-minutes. This will allow oil to coat the Impactor's internal
components.
Compressed air is an invisible hazard. Any
component through which it passes is capable of
releasing an explosive force which could result in
personal injury or death. As noted earlier, all
persons involved in the operation and maintenance
of this equipment should be thoroughly familiar with
its use.
Be sure all hose connections are tightly secured. A
loose hose not only causes air leaks, but can whip
around and injure personal in the area. Secure
hose couplings with safety pins, clips, cables or
chains.
10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GO-A8-PW and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents