S/N
Components
4
Mechanical safety locking unit
5
Upside pulley and steel cable
6
Slider and its moving tracks
7
Cylinder connector
Downside pulley and steel
8
cable
9
Lifting adapter
10
Swing arm locking units
11
Expansion bolts
12
Steel cables
If users stick to the above maintenance requirements, the lift will always keep a good working condition
and its service life could be extended.
Installation, Operation and Parts Manual
Methods
Check if mechanical locking hooks can engage or disengage
simultaneously by pushing control buttons.
Lubricate the pulley and steel cable.
Inspect and add more grease when necessary.
Lubricate the slider and its moving path inside the post. Change
the slider when it is over worn.
Check the hydraulic tightness of oil cylinder connector.
Lubricate the pulley and steel cable.
Inspect and add more grease when necessary.
Check if it can screw UP and DOWN smoothly. Add grease onto
the swivel when necessary. Inspect the rubber pads and clean
off any objects that may cause sliding or damage.
Push the UP button to raise the lifting arms and check if four
swing arms are locked into position. Add grease in case
necessary.
Check with torque spanner.
Screw torque: 63‐74b.ft(80‐100Nm)
Check the synchronization of both carriages and adjust the
tightness of the cable if desynchronization is unacceptable.
28
MJ-C10
Period
every day
every 90 days
every 90 days
every 90 days
every 90 days
every day
every day
every 90 days
every day