Major MJ-C10 Installation Manual page 28

Table of Contents

Advertisement

S/N 
Components   
Mechanical safety locking unit   
Upside pulley and steel cable   
Slider and its moving tracks   
Cylinder connector   
Downside pulley and steel 
cable   
Lifting adapter   
10 
Swing arm locking units   
11 
Expansion bolts   
12 
Steel cables     
If users stick to the above maintenance requirements, the lift will always keep a good working condition 
and its service life could be extended.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Installation, Operation and Parts Manual
Methods   
Check if mechanical locking hooks can engage or disengage 
simultaneously by pushing control buttons.   
Lubricate the pulley and steel cable.     
Inspect and add more grease when necessary. 
Lubricate the slider and its moving path inside the post. Change 
the slider when it is over worn.   
Check the hydraulic tightness of oil cylinder connector.   
Lubricate the pulley and steel cable.     
Inspect and add more grease when necessary. 
Check if it can screw UP and DOWN smoothly. Add grease onto 
the swivel when necessary. Inspect the rubber pads and clean 
off any objects that may cause sliding or damage.   
Push the UP button to raise the lifting arms and check if four 
swing arms are locked into position. Add grease in case 
necessary.   
Check with torque spanner.   
Screw torque: 63‐74b.ft(80‐100Nm)   
Check the synchronization of both carriages and adjust the 
tightness of the cable if desynchronization is unacceptable.     
 
 
 
28
MJ-C10
Period   
every day   
every 90 days   
every 90 days   
every 90 days   
every 90 days   
every day   
every day   
every 90 days   
every day   

Advertisement

Table of Contents
loading

Table of Contents