Installation, Operation and Parts Manual
MJ-C10
Vent air remained in the cylinder
After bleeding system, fluid level in power unit reservoir may be down. Add more fluid if necessary to raise lift to full height. It is only
necessary to add fluid to raise lift to full height.
Check the synchronization of both lifting carriages.
Ensure the synchronization by adjusting the balance steel cables at both sides. Make both cables be of the same tightness.
This could be judged by the sound emitted by the safety locking unit during lifting process.
Check the mechanical safety locking unit.
Check and ensure both safety locking hooks can be effectively engaged or released.
Step 14: Fix the protective column curtain.
1.Hex nut M6
22