INSTALLATION INSTRUCTIONS
4.1 Preparations before installation
4.1.1 Space requirements.
Refer to 3.4 for the dimensions of the lift. There must also be a clearance of at least 1 meter between the lifting platform and fixed
elements (e.g. wall) in all lifting positions. There must be sufficient space for driving vehicles on and off.
4.1.2 Foundations and connections
The user must have the following work performed before erecting the lift.
Construction of the foundation following consultation with the manufacturer's customer service or an authorized service agent. Routing of
the wiring to the installation location. The user must provide fuse protection for the connection. Electrical system connection must be
done by licensed technicians. Requirements for power supply cable of the installation site: at least 2.5mm
2
4.0mm
wire core for 1Ph power.
Refer also to the corresponding information on the name plate and in the operation instructions.
Before doing electrical connection, make sure the lift is electrically adapt to the local power supply.
4.1.3 Foundations preparations
Refer to Annex 1 for footing.
C25 concrete foundation with a minimum thickness of 200mm (continuous footing).
Surface: Horizontal and even (Gradients max. 0.5 %)
Newly built concrete ground must be older than 20days.
4.1.4 Tools and equipment needed for installation
Tool name
Electrical drill (C10)
Open spanner
Adjustable spanner
Cross socket screw driver
Quick spanner handle adapter/ Ratchet
Socket spanner
Levelling device
Hammer
Truck lift
Lifting string
Torque spanner
4.2 Installation attentions
4.2.1 Joints of oil hose and wiring must be firmly connected in order to avoid leakage of oil hose and looseness of electrical wires.
4.2.2 All bolts should be firmly screwed up.
Installation, Operation and Parts Manual
Specification
D18 drill bit
D17‐19
bigger than D30
PH2
REB‐310
D24
Accuracy: 1mm
10 pounds
Capacity,1000kg
Capacity, 1000kg
MD400
13
MJ-C10
2
wire core for 3Ph power and
Quantity
1
2
1
1
1
1
1
1
1
2
1