6.5.18. Programming regeneration cycle times
Set the cycle times of the regeneration.
Note
Five cycles can be set. The system displays the programming cycles. The display allows
setting of a specific time for each cycle. If a cycle is set to NO, the next cycles is not activated.
Note
The sequence of the regeneration cycles depends upon regenerant flow, see 3.4. System
regeneration cycle, page 18.
AP Adjust the cycle time with
AQ Press
to validate the selection and advance to the next
parameter.
AR Repeat for each cycle.
6.5.19. Auxiliary relay/Chemical pump
Mandatory
The system can't be set with auxiliary relay and chemical pump at the same time. Only one
option can be used.
6.5.19.1 Auxiliary relay
Set the relay output during regeneration.
Note
This parameter has two steps of settings. The first one activates the output, and the second
one deactivates the output. The time 00:00:00 correspond to the beginning of regeneration
time.
Ref. MKT-IM-002 / B - 23.05.2018
Installer Manual Fleck 2910 - NXT - Programming
,
and
.
1. Backwash: 10 min.
CYCLE 1 00:10:00
BACKWASH
2. Draw/Slow rinse: 1 h 10
min.
CYCLE 2 01:10:00
BRINE&SLOW RINSE
3. Fast rinse: 10 min.
CYCLE 3 00:10:00
RAPID RINSE
4. Refill: 10 min.
CYCLE 4 00:10:00
BRINE TANK FILL
5. Pause: not used.
CYCLE 5 OFF
PAUSE & DELAY