In Open Circuit Operation, The Voltage At The Dc-Capacitors (24) Is Not Regular - Cebora POWER SPOT 5600 Service Manual

Table of Contents

Advertisement

CEBORA S.p.A.

3.3.4 - In open circuit operation, the voltage at the DC-capacitors (24) is not regular.

To check the open circuit operation of the power source, you must measure the output voltage
directly on the DC-capacitors (24), since the output terminals (F) and (G) of the power source are
connected to this potential only at the moment of welding.
DC-capacitors (24) are normally discharged by the control, which inserts the discharge resistor
If this circuit does not work the DC-capacitors (24) remain charged for several hours.
TO DISCHARGE THEM MANUALLY, TEMPORARILY APPLY A RESISTANCE OF 470
OHM 50 W IN PARALLEL TO THE DC-CAPACITORS (24).
NEVER SHORT-CIRCUIT THE TERMINALS OF THE DC-CAPACITORS (24).
The large capacity of the DC-capacitors (24) may produce very high currents, even with just a
VOLTAGE ON THE DC-CAPACITORS (24) ADJUSTMENT TEST.
Terminals of the DC-capacitors (24) = same voltage used the last time welding was
performed, or standard voltage for the type of accessory applied to the power source (ex.: 40
Vdc for the gun provided).
Adjust the keys (A) or (B) to increase or decrease the programmed voltage, shown on display
(E). When the keys are released, display (E) flashes to indicate that the voltage on the DC-
capacitors (24) is changing to reach the programmed value. When the flashing stops, the
voltage on the DC-capacitors (24) has reached the programmed value.
♦ Check the flat cable between CN4 power board (12) and CN2 control board (2).
♦ Check the status of the relay RL2 on power board (12). In normal conditions it
must not be powered and its NC contact actually closed.
♦ With the power source off, check on CN2 of power board (12) to make sure
resistance of terminals 5 and 6 = approximately 60 ohm. If >Mohm (circuit
broken) replace discharge resistor (7). If 0 ohm (short-circuit) replace discharge
resistor (7) and power board (12).
♦ See POWER SUPPLY AND CONTROL BOARD (2) TEST and SERVICES
POWER SUPPLY TEST par. 3.3.1.
♦ Replace the control (2) and/or power (12) boards.
♦ Regular operation.
3.302.311
WARNINGS
(7) in parallel until the programmed voltage is reached.
few volts, with serious danger to the operator.
YES
NOTE
Correct?
NO
12
23/01/2015