Download Print this page

Advertisement

Quick Links

General Instructions
06LOG125SG-V1 & 06LOG125DG-V1 (4x4m)
06LOG125SG-V1: 4x4m 28mm apex cabin with single (glass) glazing.
06LOG125DG-V1: 4x4m 28mm apex cabin with double (glass) glazing.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a
circular saw when cutting
roof and oor boards.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 06LOG125SG-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 06LOG125SG-V1

  • Page 1 06LOG125SG-V1 & 06LOG125DG-V1 (4x4m) Summer = Low Moisture = Contraction erected by two adults 06LOG125SG-V1: 4x4m 28mm apex cabin with single (glass) glazing. 06LOG125DG-V1: 4x4m 28mm apex cabin with double (glass) glazing. BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you...
  • Page 2 06LOG125SG-V1 & 06LOG125DG-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 4110mm Log Board (WA) - 120x28x4800mm QTY 2 Depth = 5232mm LB28-4400mm Height = 2741mm Base Dimensions: Log Board (WA) - 120x28x5200mm QTY 2...
  • Page 3 Please retain product label and instructions for future reference Step 2 The Mortice Lock is Reversible Fit the mortice lock (No. 25) into the recess in the master door (No. 3) and secure using the screws provided. Attach the key plate (No.
  • Page 4 Please retain product label and instructions for future reference Step 4 Step 6 Fix the casement stay (No. 30) onto Following the same method the window (No. 1) and the casement outlined in Step 5, arrange the stay pins to the window cill using remaining framing (No.
  • Page 5 Please retain product label and instructions for future reference Step 8 (See Pre-Assembly) IMPORTANT: It is imperative that you pre-drill before xing screws. Step 10 (See Pre-Assembly) IMPORTANT: It is imperative that you pre-drill before xing screws. Following the same method Following the same method outlined in Pre-Assembly, lay outlined in Pre-Assembly, lay...
  • Page 6 Please retain product label and instructions for future reference Step 12 (See Pre-Assembly) Step 13 (See Pre-Assembly) IMPORTANT: It is imperative that you pre-drill before xing screws. Following the same method Following the same method outlined in Pre-Assembly, lay outlined in Pre-Assembly, lay the remaining boards (No’s.
  • Page 7 Please retain product label and instructions for future reference Step 15: Ridge Bar Fit Step 16 Align the ridge bar(s) (No. 17) into the Place the rst two roof board’s cut out slots on each gable top ensuring (No. 13) onto the assembly on each ridge bar interlocks the boards.
  • Page 8 Please retain product label and instructions for future reference Step 17 Step 18 Ensuring the roof boards are ush Place the rst oor board (No. 14) at the overhanging side and meet inside the building ush to the log at the apex, x the eaves frames board on one side.
  • Page 9 Please retain product label and instructions for future reference Step 19 Step 21 Roof Inside the building place an internal Cut the felt into ve & strips lay onto roof trim (No. 24) against the boarding the roof in the order shown in the and align with the roof as shown in the illustration.
  • Page 10 Please retain product label and instructions for future reference Step 22 Align the fascia’s (No. 18) with the roof and x into It is ESSENTIAL that you apply wood place using 3x40mm treatment immediately after the building screws per fascia, making has been assembled.

This manual is also suitable for:

06log125dg-v1